Slide background

About Createability

We are a design and build specialist working exclusively in the trust, local authority and education sectors. To date, we have delivered more than 500 developments worth over £50 million – on time and in budget.

Read more
Slide background

Design & Build

Having worked in the industry for more than 20 years, Createability is confident in its ability to turn your vision into a practical reality; to turn initial designs into completed builds.

Read more
Slide background

Education

Our collaboration with schools and colleges includes upgrading existing sport centres to developing from scratch much needed sports and gym facilities.

Read more
Slide background

Leisure

What sets Createability apart from other leisure environment providers is the fact that it has a high degree of technical expertise in-house, and so is able to offer a ‘one stop shop’ service to customers.

Read more

Home

Recent News / Latest Items

28 Dec

Leisure Construction Design Focus – Dec 15

For this Leisure Construction Design Focus we are highlighting a leisure construction project brief which required a stylish update to the exiting facilities: Our brief:

Twitter / Latest Tweets



Testimonials / What Our Clients Say

  • Throughout the project there was effective communication with the Createability team. Any concerns from either party were dealt with swiftly in a professional manner. I consider the standard of workmanship to have been good with all snagging issues being dealt with efficiently.
    David Wright, Active Luton
  • "This was a reasonably complex refurbishment on an existing facility within a new contract and so it was important that the project went well without any unnecessary delays or problems. The contractor delivered the project to the required time frames and standards in what was almost a turnkey operation" Parkside Swimming Pool, Cambridge
    Roy Clarke, Head of Corporate Technical Services
  • Createability provided an innovative solution which met our business needs and have proven to be both flexible and supportive to changes throughout the scheme. The project was delivered on time and on budget in a positive spirit of partnership.
    Joel Chapman, Tone Leisure, Commercial Director
  • Createability proved to be a very reliable and flexible contractor and assisted us in making minor changes and other maintenance issues that developed whilst completing the project with very little fuss. We were very pleased with the overall finish achieved and would not hesitate to use them again.
    Steve Davis, Managing Director, Your Leisure Kent Ltd
  • The feedback we have had has been wonderful. Our new customers love the facilities, and our retained customers really like that we have moved from old fashioned to modern without having to raise our membership prices whatsoever. We have a very high client retention, which is a testament to the great work Createability and our staff have done; I would certainly recommend them to other leisure centres looking to undertake a similar project.
    Simon Bell, General Manager of One Leisure
  • I would recommend Createability to other schools. They are a straight-talking, honest organisation and were great to work with. There were a few special requirements towards the end, in particular with the new roof, but Createability were so accommodating. I am incredibly proud of what has been achieved.
    Tony Bloxham, Principal of Preston School
  • Createability worked with us to explore the possibilities this extra space could include. Getting advice from a practical building and cost perspective was extremely useful and the visuals provided helped us to see how the options would look. Now the work is finished it has become obvious just how accurate these were.
    Bevis Moynan, Centre Manager Huntingdon Leisure Centre
  • "Here's an enormous thank you for your company's enormous effort, precision and professionalism throughout the fit out of our new club. You've delivered a product that sits superbly well in the fitness industry, and I'm a very happy man. It's very rare to find a company that is willing to go beyond what's required, and deliver brilliantly. I will without question only use Createability for all my future gyms to come."
    Mark Anthony, Chief Executive, Rush Fitness Group
  • "This project was completed in a live environment - Aside from the area under refurbishment no losses of facilities were report during the construction period. The over finish of the project and the time taken to deliver it were well above expectations." Abbey Pool Complex, Cambridge
    Roy Clarke, Head of Corporate Technical Services, GLL
  • The site has been transformed and the new development provides the area with a family destination to be proud of. The Council had been providing a support grant of £882,000 annually but we are on track to reduce this over the next two years so the facility becomes self-funded. This is the third time I’ve worked with Createability and I was confident they would deliver a quality job within the agreed timescales and budget. As with most projects, there are inevitably ‘on the hoof’ revisions to the original design, but Createability managed to accommodate the changes we wanted within the agreed budget.
    Gary Milne, Managing Director, Southsea Leisure Limited
  • We will certainly be in contact with Createability regarding future projects. I would whole-heartedly recommend their services to other leisure operators; Createability listens to the needs of their customers, offers carefully considered solutions and responds to any challenges in a swift and professional manner.
    Joel Chapman, Commercial Director for Tone Leisure
  • “Middleton Pool was built back in 1957 as an open air lido, but a roof was put on in 1989 to ensure the pool was viable 12 months a year. However, people now demand a wider choice for their exercise options and so adding a fitness suite to the offering was a natural progression. Createability’s plans look amazing and we are all really excited to see the finished result.”
    Simon Churchman, Contracts Manager
  • "This was an excellent project, delivered in a “live” environment, with a great quality products and very happy client."
    Sarah Watts, Chief Exec., Alliance Leisure Services
  • Overall the work was well organised, thorough and proved a good experience throughout, something you can rarely say about the construction phase of a project. We are very pleased with the result, Createability delivered just what we wanted and the Centre is achieving the business objectives we forecast. Our location is fairly isolated and with a relatively small captive audience we need high market penetration. Local goodwill and word of mouth are critical to the success of this facility. Our decision to focus on quality was absolutely right. The first impression the new reception area creates cannot be underestimated and activities are proving popular. The development has been great for staff morale too. Thumbs up all round.
    Jeremy Platt, Operations Director, Northumberland County Council
  • The project was delivered in a professional and positive manner throughout, to budget and on time. The quality of information provided throughout the project was excellent and aided critical decision making on both options and costs.
    Darren Lamb, Director of Operations, North Country Leisure
  • Createability’s attention to detail on the development has provided a product that is a cut above the usual expectation of budget clubs. Our theory and differentiation from other budget brands lies in the sum of many small things, and over delivering on people’s expectations. We see all this as part of a retention strategy, as we lack the obvious magnets of swimming pools and saunas. For example we’ve made the showers spectacularly good. The idea is to focus on the detail that most people notice. We’re really pleased with how well the opening has gone and have had lots of great feedback. Getting the site open on time and within budget was all about Createability’s experience in this field. A very professional, very capable bunch who we’d unhesitatingly use again.
    Rupert Mackenzie-Hill, CEO, Kiss Gyms
  • "This was a well finished project delivered on time despite us adding a large amount of extras in the last month of the contract. The whole team were helpful and approachable, including the workmen on site which was hugely important to us as a school."
    Business Manager, Freemantle C of E Community Academy
  • The redevelopment has worked on a number of levels; income generation, staff morale and customer perception. At some stage in the future the Centre may be rebuilt but this sends a clear message to our customers that the Council is prepared to reinvest in its leisure provision and at a standard that equates to that of local private sector operators. The reception area has been reinvigorated and the team have renewed levels of enthusiasm. I’ve worked with a number of building contractors and wouldn’t use all of them again – but I would use Createability. Their standard of workmanship was of a high quality and the interaction we had with the on-site team was good, which is particularly helpful during what can be a disruptive period.
    Kerry Taylor, Centre Manager, King Alfred Leisure Centre
  • "Works included the fitting of a building - including changing room provision for wet and dry changing rooms, premium gym, dance studio, reception area and Cafe. All works were completed within budget, time scales and to a high quality - overall we were more than satisfied with the final finish." Charlton Lido, London
    Lucy murray-Robertson, Project Co-ordinator
  • There were inherent issues of keeping the Centre open whilst work took place but Createability managed the project expertly and public disruption was minimised…Public response has been excellent and the centre is well ahead of target financial projections. We remain in healthy contact with Createability and would not hesitate to use them if a similar project arose.
    Simon Bell, One Leisure, Huntingdon District Council, General Manager